CONTROL AND REGULATION OF THE PRESSURES IN THE
HYDRAULIC CIRCUITS
20-39
TESTING AND ADJUSTMENTS
CONTROL AND REGULATION OF THE PRESSURES
IN THE HYDRAULIC CIRCUITS
.
The control valve consists of the spools that command:
Command
Ports
Swing (R.H. - L.H.)
A1 - B1
Travel motor L.H.
(Forwards - Backwards)
A2 - B2
Travel motor R.H.
(Forwards - Backwards)
A3 - B3
Boom swing (R.H. - L.H.)
A4 - B4
Blade (Raise - Lower)
A5 - B5
Arm (Close - Open)
A6 - B6
Boom (Lower - Raise)
A7 - B7
Bucket (Dump - Curl)
A8 - B8
Hammer (Suction - Delivery)
A9 - B9
PC20R-8 PC27R-8
RKP06460
1
2
3
4
5
6
7
8
9
A
B
H
Test conditions:
.
Engine: at working temperature.
.
MIN and MAX. engine speeds: within permissi-
ble limits.
.
Hydraulic oil: 45 ± 55 ëC.
Before removing the plugs in order to measure the
pressures, release the residual pressures in the
circuits (see «ELIMINATION OF THE RESIDUAL
PRESSURES IN THE CIRCUITS AND IN THE
TANK») and place the safety engagement levers
into their locked positions.
After having connected the pressure gauges, pres-
surise the tank. For details, see «PRESSURISA-
TION OF THE TANK».
RKP06470
2
1
3
DIESEL
P1
P2
SERBATOIO
SCAMBIATORE
4
COOLER
TANK
DIESEL
Summary of Contents for F30791
Page 1: ......
Page 2: ...40 28 PC15R 8...
Page 4: ...00 2 PC20R 8 PC27R 8...
Page 17: ...GRUPPO 10...
Page 18: ...40 28 PC15R 8...
Page 32: ...10 14 PC20R 8 PC27R 8 PAGE INTENTIONALLY LEFT BLANK...
Page 34: ...10 16 PC20R 8 PC27R 8 PAGE INTENTIONALLY LEFT BLANK...
Page 36: ...10 18 PC20R 8 PC27R 8 PAGE INTENTIONALLY LEFT BLANK...
Page 61: ...10 43 PC20R 8 PC27R 8 PAGE INTENTIONALLY LEFT BLANK...
Page 86: ...10 68 PC20R 8 PC27R 8 PAGE INTENTIONALLY LEFT BLANK...
Page 94: ...10 76 PC20R 8 PC27R 8 PAGE INTENTIONALLY LEFT BLANK...
Page 98: ...10 80 PC20R 8 PC27R 8 PAGE INTENTIONALLY LEFT BLANK...
Page 108: ...10 90 PC20R 8 PC27R 8 PAGE INTENTIONALLY LEFT BLANK...
Page 110: ...10 92 PC20R 8 PC27R 8 PAGE INTENTIONALLY LEFT BLANK...
Page 112: ...10 94 PC20R 8 PC27R 8 PAGE INTENTIONALLY LEFT BLANK...
Page 114: ...10 96 PC20R 8 PC27R 8...
Page 115: ...GRUPPO 20...
Page 116: ...40 28 PC15R 8...
Page 180: ...H 20 64 TESTING AND ADJUSTMENTS PC20R 8 PC27R 8...
Page 181: ...GRUPPO 30...
Page 182: ...40 28 PC15R 8...
Page 262: ...30 80 REMOVAL AND INSTALLATION PC20R 8 PC27R 8...
Page 263: ...GRUPPO 40...
Page 264: ...40 28 PC15R 8...
Page 287: ...40 23 PC20R 8 PC27R 8 PAGE INTENTIONALLY LEFT BLANK...
Page 298: ...40 34 PC20R 8 PC27R 8...