CONTROL AND ADJUSTMENT OF THE INJECTION TIMING
20-29
TESTING AND ADJUSTMENTS
CONTROL AND ADJUSTMENT OF THE INJECTION TIMING
H
Check the injection timing of the N
o
.1 cylinder by
means of the N
o
.1 union of the injection pump.
H
The cylinders are numbered 1-2-3 counting from the
flywheel side.
H
The spark advance notches of 0ë-10ë-15ë-20ë; are
also marked on the flywheel. In order to read the inter-
mediate values, sub-divide the sections between the
two marks into equal lengths.
1 - Remove the cap (1) of the flywheel casing.
2 - Pass a screwdriver between the teeth and rotate the
flywheel in a counter-clockwise direction (as seen
from the flywheel side) until the 1/3 notch of the fly-
wheel is aligned with the notch (2) marked inside
the hole in the casing.
H
In this position, the piston of the N
o
. 1 cylinder is
at the top dead centre (B.T.D.C.). Check that the
cylinder is in a compression stroke, i.e. that both
valves are closed.
H
Once the B.T.D.C. has been ascertained, rotate
the drive shaft in a clockwise direction (seen from
the flywheel side) for about 25 teeth.
3 - Take off the clamp (3) and disconnect all the fuel de-
livery tubes (4) from the injection pump.
4 - Rotate the flywheel slowly in a counter-clockwise di-
rection (seen from the flywheel side), checking care-
fully the level of the fuel in the No. 1 union of the in-
jection pump. Stop the rotation when the fuel level
starts to rise.
5 - Check the position of the notches at 15ë and 10ë that
appear in the hole in the casing and, in function of the
position, establish the true fuel injection timing.
H
In order to determine the degrees of intermediate
fuel injection timing, sub-divide the space be-
tween 10ë and 15ë.
H
Normal fuel injection timing: 14
w
1ë
PC20R-8 PC27R-8
RKPA3190
1
RKPA0060
2
RKPA2151
3
4
RKPA0011
Notch
2
20
°
15
°
10
°
1/3
10
°
15
°
Summary of Contents for F30791
Page 1: ......
Page 2: ...40 28 PC15R 8...
Page 4: ...00 2 PC20R 8 PC27R 8...
Page 17: ...GRUPPO 10...
Page 18: ...40 28 PC15R 8...
Page 32: ...10 14 PC20R 8 PC27R 8 PAGE INTENTIONALLY LEFT BLANK...
Page 34: ...10 16 PC20R 8 PC27R 8 PAGE INTENTIONALLY LEFT BLANK...
Page 36: ...10 18 PC20R 8 PC27R 8 PAGE INTENTIONALLY LEFT BLANK...
Page 61: ...10 43 PC20R 8 PC27R 8 PAGE INTENTIONALLY LEFT BLANK...
Page 86: ...10 68 PC20R 8 PC27R 8 PAGE INTENTIONALLY LEFT BLANK...
Page 94: ...10 76 PC20R 8 PC27R 8 PAGE INTENTIONALLY LEFT BLANK...
Page 98: ...10 80 PC20R 8 PC27R 8 PAGE INTENTIONALLY LEFT BLANK...
Page 108: ...10 90 PC20R 8 PC27R 8 PAGE INTENTIONALLY LEFT BLANK...
Page 110: ...10 92 PC20R 8 PC27R 8 PAGE INTENTIONALLY LEFT BLANK...
Page 112: ...10 94 PC20R 8 PC27R 8 PAGE INTENTIONALLY LEFT BLANK...
Page 114: ...10 96 PC20R 8 PC27R 8...
Page 115: ...GRUPPO 20...
Page 116: ...40 28 PC15R 8...
Page 180: ...H 20 64 TESTING AND ADJUSTMENTS PC20R 8 PC27R 8...
Page 181: ...GRUPPO 30...
Page 182: ...40 28 PC15R 8...
Page 262: ...30 80 REMOVAL AND INSTALLATION PC20R 8 PC27R 8...
Page 263: ...GRUPPO 40...
Page 264: ...40 28 PC15R 8...
Page 287: ...40 23 PC20R 8 PC27R 8 PAGE INTENTIONALLY LEFT BLANK...
Page 298: ...40 34 PC20R 8 PC27R 8...