20
1490289-W2-A
Commissioning
Before carrying out the commissioning procedure install the Shower Fittings,
refer to the Shower Fittings Installation and User Guide.
Turn temperature control
to the cold position.
Turn power control to
low.
Switch on the electrical
supply.
Push START/STOP
button.
Water flows freely within a
few seconds, temperature
remains cool
Turn power control to
Eco.
COLD
0 - 15 secs
HOT
Turn power control to
High.
Temperature will rise
slightly.
5 - 10 secs
COLD
HOT
Temperature will rise
further.
5 - 10 secs
COLD
HOT
1
4
7
2
5
8
3
6
9
Summary of Contents for Mira Jump 10.5 kW
Page 2: ...2 1490289 W2 A ...
Page 30: ...30 1490289 W2 A Notes ...
Page 31: ...31 1490289 W2 A Notes ...