2. Install the Control Box
Inlet
NOTE: Verify that the hose will reach the supply stop by attaching the flex hose to
the control box inlet.
NOTE: Refer to the specification sheet to determine the control box installation
location.
Verify that the sensor cable is below the countertop.
Unthread the control box screws to remove the cover.
Drill 1/8" (3 mm) pilot holes.
Use the standard wall anchors (provided) depending on your wall material.
Attach the control box to the wall with the arrow pointing upward. Secure with
the two screws (provided).
Kohler Co.
5
1357694-2-
B
Summary of Contents for Kumin K-104K36-SANA-CP
Page 49: ...Kohler Co 49 1357694 2 B ...
Page 50: ...1357694 2 B 50 Kohler Co ...
Page 51: ...Kohler Co 51 1357694 2 B ...