MDC-2200/2500 Series
Chapter 3 Method of installation
0092625002-06
3-15
Flush mounting the Operation panel
Preparation:
(1)
Cut an opening with the size as shown in Figure 3.15 on the side for mounting a Display unit
on the panel.
(2)
Mark the place of holes for mounting.
(4mm screw for 4holes)
(15/32)
12
(5 3/64)
128
(4 5/64)
122
(15/32)
12
(12 33/64)
318
(15/32)
12
(13 15/32)
342
(3 55/64)
98
(13 45/64)
348
Unit : mm(inch)
Installation:
(1) Remove corner guard caps of four corners of the Operation panel enclosure.
(2) Insert the Operation panel and its connecting cable into the opening and adjust the Operation
panel parallel to the mounting face (Figure 3.16).
(3) Secure the Operation panel to the panel with 4 mm tapping screw (4 places).
(4) Return corner guard caps removed in (1) to the original places.
Operating unit
M4 screw
(four places)
Corner guard cap
(four places)
Note) Panel thickness: 10 mm (max)
Figure 3.15 Diagram of processing holes for mounting an Operation panel
Figure 3.16 Flush Mounting the Operation panel
Operation panel
Summary of Contents for MDC-2200 series
Page 1: ......
Page 67: ...MDC 2200 2500 Series Chapter 5 Detailed setup and additional menu 0092625002 06 5 5 ATA EPA ...
Page 123: ......