Preparing the PROCESSOR for Installation
5B6339 – January 1996
15
Checking the GEARS
[4] Check that the RACKS are in the correct positions and are seated correctly.
[5] Check that the GEARS of the RACKS engage the GEARS of the MAIN DRIVE SHAFT.
[6] If necessary for local codes, install a SEISMIC KIT. Use SEISMIC KIT 8B6812 for 3/8-in. LEVELING SCREWS
or SEISMIC KIT 8B7038 for 1/2-in. LEVELING SCREWS. Each SEISMIC KIT includes all parts necessary to
install the BRACKETS on one PROCESSOR
H148_0019BA
H148_0019BCA
SHAFT
DRIVE
MAIN
GEAR
RACK
on a
GEAR