INSTALLATION INSTRUCTIONS
32
January 1996 – 5B6339
Measuring the Static Pressure and Making the Exhaust Connections
Note
For optimum operation of the PROCESSOR, do this
procedure.
[1] With the PROCESSOR de-energized, disconnect
P/J16 and P/J20 from the front of the
COMPONENT PLATE.
[2] Energize the PROCESSOR.
(a) Move the wall CIRCUIT BREAKER to the
“ON” position.
(b) Move the MAIN CIRCUIT BREAKER CB1
on the PROCESSOR to the “ON” position.
[3] Check that the EXHAUST BLOWER actuates.
[4] Connect the RUBBER HOSE to the CENTER
CONNECTOR of the AIR METER TL-2431. Do
not connect the L TUBE to the RUBBER HOSE.
J6
DEV
THERMISTOR
J7
FIX
J10
LEVEL
SENSOR
J100
FIX MGR.
J11
REPLEN
CALIBRATE
SWITCH
CB2
CB3
CB4
ON
OFF
ON
OFF
ON
OFF
J17
EXHAUST
BLOWER
J18
DEV
HEATER
J19
FIX
HEATER
J20
DRYER
BLOWER
J13
RECIRC
PUMP
J14
DEV
REPLEN
PUMP
J15
FIX
REPLEN
PUMP
J16
DRYER
HEATER
H148_0044BA
J8
DRYER SPARE
J12
ACCESSORY
J9
H148_0001GA
MAIN CIRCUIT BREAKER CB1
H148_0001GCC