©
KÖBER SRL VADURI
BRANCH
1
USER MANUAL C33GC24
Content
1
Safety instructions and symbols
2
Valability of instructions
3
EC Marking
4
Use according to destination
5
Safety instructions
5.1 Installation and adjustment
5.2 Gas smell
5.3 Changes in the area adjiacent to the heating station
6
Technical and functional characteristics
7
Mounting
7.1 Mounting set
7.2 Dimensions and mounting positions
8
Intallation
8.1 Conditions for the installation of the central heating station
8.2 Gas connecting pipe
8.3 General directions for the heating installation
8.4 General directions for the hot water circuit
8.5 Connecting pipe of the condensation output duct
8.6 Connecting pipe of the safety valve
8.7 Air inlet pipe / burnt gases outlet pipe
8.8 Electric grid connection
8.9 Filling and emptying the heating circuit
9
Operation instructions
9.1 Control panel
9.2 Description of control panel
9.3 Choosing the functioning modes of the station
9.4 Functioning as waste hot water station
9.5 Functioning as heating station
9.6 Preset functions related to station safety
9.7 Error signals
9.8 Boiler switch off in safety conditions
9.9 User training
9.10 Quality conditions and warranty
10
Inspection and maintenance
10.1 Inspection and maintenance intervals
11
Drawings necessary for mounting and installation
11.1 Types of configurartions for the mounting kit for air input/ burnt gases output
11.2 Minimum distances recommended for the mounting of the co-axial kit
11.3 Hydraulic characteristic of pump
11.4 Functioning schemes covered by warranty
2
2
2
2
3
3
3
3
4
5
5
6
7
7
8
9
9
10
11
11
11
12
14
14
15
16
17
18
18
19
21
21
21
22
22
23
24
25
26
27
EN