All work on the machine may only be performed by trained personnel.
Observe the local applicable safety and accident prevention regulations.
CAUTION
Fill coolant unit (6-1/1) with approx. 35 liters of
water (incl. coolant additive).
For information on coolant additive, see Chapter
8.1.
The discharge (6-2/1) must be set up so that waste
water can flow into the sieve basket.
The sieve basket is attached by means of recesses.
Connect power plugs (CEE plugs) to the on-site outlet (3x 400 V, 32 A) and set main switch to
“I”.
6. Commissioning
Figure 6-1
Filling the coolant unit
Figure 6-2
Adjusting the discharge