22
5. Installation
5.1 Selection of qualified personnel
We recommend having maintenance work on the grinding machine
carried out by trained KNECHT personnel.
We are not liable for any damage resulting from improper installation.
CAUTION
5.2 Installation site
Consider the necessary space requirements for installation, maintenance, and repair work when
determining the location at which to set up the grinding machine.
5.3 Supply connections
The grinding machine is provided with the corresponding connection cable.
Confirm that the machine is correctly connected to the current supply.
CAUTION
5.4 Settings
KNECHT Maschinenbau GmbH will configure the various components as well as the electrical
system before delivery.
ATTENTION
Unauthorized changes to the preset values
are not permitted and can damage the grind-
ing machine.