BOV
SPOOL
REASSEMBLY
1.
Lubricate
the
O
‐
ring
channels
for
the
3
spool
O
‐
rings
(18)
,
in
the
metal
spool
(16)
(Fig.
10)
.
Then
install
the
four
O
‐
rings
(18,
24,
25,
29)
.
NOTE:
Using
a
syringe
simpli
fi
es
this
task
and
reduces
waste.
Lubrica ng
the
3
spool
O
‐
ring
grooves
directly
also
improves
SPOOL
(16)
rota onal
movement.
2.
Lightly
lubricate
the
internal
walls
of
the
BOV
housing
(1)
.
3.
Being
careful
not
to
pinch
any
O
‐
rings,
press
the
spool
(16)
into
the
BOV
housing
(1)
(Fig.
11)
.
NOTE:
Ensure
that
the
holes
for
the
installa on
of
the
LEVER
(34)
are
aligned
when
installing
the
SPOOL
(16).
4.
Holding
the
lever
screw
(33)
in
one
hand,
place
the
O
‐
ring
(35)
in
the
groove
as
shown
(Fig.
12)
.
5.
Hold
the
lever
(34)
in
place,
and
start
the
lever
screw
(33)
by
hand
clockwise.
Then
con nue
ghtening
the
lever
screw
(33)
with
a
5/32"
L
‐
shaped
Allen
key
(Fig.
13)
.
DO
NOT
over
‐
ghten.
NOTE:
Be
careful
not
to
damage
the
sealing
surface
of
the
INNER
SPOOL
(16)
and
BOV
HOUSING
(1).
NOTE:
If
replacing
the
MUSHROOM
VALVES
(26),
ensure
not
to
place
damaging
stress
on
the
VALVE
HOLDERS
(22,
23).
Figure 10
Figure 11
Figure 12
Figure 13
Summary of Contents for ORCA SPIRIT
Page 4: ...4 MSL 72 161 Jetsam Orca Spirit manual R 5 Photo s by Jim Abernethy and Doug Ebersole...
Page 21: ...21 MSL 72 161 Jetsam Orca Spirit manual R 5...
Page 25: ...25 MSL 72 161 Jetsam Orca Spirit manual R 5...
Page 124: ...KISS Rebreather LLC www kissrebreathers com info kissrebreathers com...