60
Check the wiring both inside and outside the enclosure when fuses are broken. Finally,
replace the fuses by new ones.
Measurement
signal
Power terminal
with internal
fuse
Power/signal
cables
Over voltage
protection
12 VDC Power
RS485
Antenna cable
RF modem
Solar panel
Solar controller
with internal fuse
12 VDC Battery
plus external fuse
Adapter and
lightning arrestor
To PC
RS232
Steel enclosure weather station
‘Load’ (12 VDC)
Pressure sensor
Earthing
Sensors
1
2
3
Figure 38: Location of fuses in enclosure of LAS-RET (1: Power terminal; 2: Solar
controler; 3: Battery).
Measurement
signal
Power terminal
with internal
fuse
Power/signal
cables
Over voltage
protection
12 VDC Power
To PC
RS232
Steel enclosure
12 VDC power
Pressure sensor
Earthing
LAS- Re Sensors
1
Figure 39: Location of fuses in enclosure of LAS-BET (1: Power terminal).
2. Check data logger date and time
To change data/time see APPENDIX 7 – SETTING DATE / TIME COMBILOG for instructions
or the COMBILOG instruction manual.
3. Check sensor output
When all sensors of the weather station are operational the red LED “ERR” of the COMBILOG
is switched OFF. In case one of sensors of the weather station is malfunctioning the red LED
Summary of Contents for LAS
Page 1: ...Instruction Manual Large Aperture Scintillometer LAS...
Page 28: ...27 Figure 17 Operational weather station of LAS RET system...
Page 29: ...28...
Page 39: ...38...
Page 45: ...44...
Page 49: ...48...
Page 51: ...50 Figure 33 Configuration screen and default settings of supplied RF modems...
Page 55: ...54...
Page 69: ...68...
Page 71: ...70 APPENDIX 9 CONNECTION PLAN LAS BET LAS RET Figure 47 Connection plan LAS BET system...
Page 72: ...71...
Page 73: ...72 Figure 48 Connection plan weather station LAS RET system...
Page 74: ...73 Figure 49 Connection plan scintillometer LAS RET system...