20
burner switching frequency and the dimensions of the combustion chamber / ash
chamber.
On average, it should be performed once a week.
2.
Use only the fuel recommended by the manufacturer.
3.
It is not allowed to burn in the burner materials not intended for the burner.
4.
Provide adequate amount of fresh air.
9.2.
Cleaning the tubular blower chamber.
During the operation of the burner, some combustion products may escape through the
vent holes in the furnace tube to the space between this tube and the outer tube. Depending on
the type of fuel used, cleaning of this component should be made approximately every 6
months. In order to remove them, follow the instructions below:
1.
Disconnect from the burner the power supplying power to the external feeder and the
controller cable.
2.
Open the boiler door, in order to get access to the furnace tube.
3.
Loosen the fixing screws (6) that secure the burner housing - 2 pcs.
4.
Remove the burner housing (9).
5.
Unscrew the fixing screws (7) - 4 pcs.
6.
Carefully remove the plate with drives and fan (8).
7.
When removing the plate (8) remove also igniter (12) from its slot.
8.
Put aside the removed assembly in a safe place, paying particular attention to the igniter.
9.
Locate and remove screw (5) and when its setting prevents loosening - manually rotate
the outer tube (1) in "Z" direction.
10.
Turn tube (1) in the direction indicated by "O" in order to remove it.
11.
Remove tube 1 and 2 from the burner.
12.
Clean the removed tubes, if necessary, clean the vent holes in tube 2.
13.
After cleaning the tubes, you may start installing the burner.
14.
Place the combustion tube (2) in tube (1) - ensure that the driver (4) is placed in the rib
(3) with an undercut.
15.
Attach both tubes to the burner, matching hooks of the tube (1) with grooves (11).
16.
Turn firmly the tubes in "Z" direction.
17.
Set the tubes in a manner allowing you to tighten the screw (5).
18.
Tighten screw (5) - it is important that it is next to the rib of tube (1) and taht it is tight-
ened to the end.
Summary of Contents for ROT-POWER 10-50 kW
Page 5: ...5 Fig 1 Block diagram of the burner ...
Page 9: ...9 Fig 2 Components of the set ...
Page 22: ...22 Fig 8 Cleaning the tubular blower chamber view 1 ...
Page 23: ...23 Fig 9 Cleaning the tubular blower chamber view 2 ...
Page 27: ...27 Fig 11 Lubricating the bearings of the combustion chamber view 1 ...
Page 28: ...28 Fig 12 Lubricating the bearings of the combustion chamber view 2 ...
Page 30: ...30 Fig 13 Igniter Replacement ...
Page 34: ...34 12 2 Electric diagram of the burner Fig 15 Wiring diagram of the burner where ...