32
11.
Burner Liquidation after its Service Life is Over
After exceeding the service life of the igniter it should be utilized according to the re-
quirements of environmental protection
12.
Electric diagram.
12.1.
Electric diagram of the controller.
Fig. 14. Wiring diagram of the controller, where:
Connection
marking
Function / sub-assembly
T1
temperature sensor of CT4 boiler
T2
DHW temperature sensor CT4
T3
feeder temperature sensor
OS
flame optical sensor
AL/RB
voltage output for alarm signalling or reserve boiler control
RELAY
relay
Summary of Contents for ROT-POWER 10-50 kW
Page 5: ...5 Fig 1 Block diagram of the burner ...
Page 9: ...9 Fig 2 Components of the set ...
Page 22: ...22 Fig 8 Cleaning the tubular blower chamber view 1 ...
Page 23: ...23 Fig 9 Cleaning the tubular blower chamber view 2 ...
Page 27: ...27 Fig 11 Lubricating the bearings of the combustion chamber view 1 ...
Page 28: ...28 Fig 12 Lubricating the bearings of the combustion chamber view 2 ...
Page 30: ...30 Fig 13 Igniter Replacement ...
Page 34: ...34 12 2 Electric diagram of the burner Fig 15 Wiring diagram of the burner where ...