29
9.5.
Igniter Replacement.
The igniter may be replaced by a service technician assigned by the manufacturer or
by a person with a permit for performing electric works up to 1 kV. The replacement should
be carried out in accordance with the following description and the accompanying drawing.
1.
Disconnect from the burner the power supplying power to the external feeder and the
controller cable.
2.
Loosen the fixing screws (1) that secure the burner housing -2 pcs.
3.
Remove the burner housing (2).
4.
Unscrew the fixing screws (3) - 4 pcs.
5.
Carefully remove the plate with drives and fan (4).
6.
When removing the plate (4) remove also igniter (6) from its slot (9).
7.
Remove only the igniter from the tube.
8.
Depending on the type, connect cables (8) to the new igniter or connect firmly the cables
of the igniter to terminals; Z2 - brown wire, Z4 - blue wire.
9.
Place the igniter inside the tube in a manner enabling it to slide out of the tube, if neces-
sary bend lamellas locking the igniter inside the tube.
10.
Place the installed igniter in the slot (9), pushing it to the screen plate.
11.
Place the igniter cable in the cable gland (5).
12.
Mount the plate with drives (4). The temperature sensor should match the slot in the tee
connector of the fuel supply. Tighten screws (7).
13.
Replace the burner housing (2).
14.
Tighten the fixing screws (1).
15.
Connect cables disconnected in par. 1.
16.
The burner is ready for operation
Summary of Contents for ROT-POWER 10-50 kW
Page 5: ...5 Fig 1 Block diagram of the burner ...
Page 9: ...9 Fig 2 Components of the set ...
Page 22: ...22 Fig 8 Cleaning the tubular blower chamber view 1 ...
Page 23: ...23 Fig 9 Cleaning the tubular blower chamber view 2 ...
Page 27: ...27 Fig 11 Lubricating the bearings of the combustion chamber view 1 ...
Page 28: ...28 Fig 12 Lubricating the bearings of the combustion chamber view 2 ...
Page 30: ...30 Fig 13 Igniter Replacement ...
Page 34: ...34 12 2 Electric diagram of the burner Fig 15 Wiring diagram of the burner where ...