INSTALLATION INSTRUCTIONS for 

 

MULTI-FUEL FREESTANDING BURNER 

JANUARY 1997 (Revised April 2016) 

(R

eferred to as the “new model” multi in our spare parts guide) 

NO LONGER IN PRODUCTION 

TESTED TO NZS 7421-1990 

 

A. 

Yunca  recommends  that  competent  trades  persons  carry  out  all  installations  (e.g.  NZHHA 

registered installer) to obtain maximum performance and safe, efficient heating. 

 

B. 

A  permit  is  required  and  we  suggest  you  check with  your  local  building  inspectors  as  by-laws 

can vary from area to area. This model is not clean air approved. 

Also notify your Insurance Company that a space heater has been installed. 

 

C. 

Floor Protector 

1. Must extend at least 300mm in front of closed door. 

2. Must extend at least 150mm on each side of heater. 

3. Must be constructed of non combustible materials giving heat resistance equal to 

concrete or brick at least 50mm thick.  

 

D. 

Seismic restraint 

Heater must be restrained from seismic movement as required by AS/NZS 2918:2001.  

 

E. 

Manufacturers recommended minimum clearances from combustible walls. 

 

APPLIED RESEARCH tested to NZS 7421-1990 

 

Clearance (FIG D) 

 

Rear Clearance (with YUNCA flue guard fitted) 

 

200mm 

 

Side Clearance (with YUNCA flue guard fitted) 

 

700mm 

 

Corner Clearance (with YUNCA flue guard fitted) 

 

200mm  

 

Rear Clearance (without YUNCA flue guard fitted) 

 

700mm 

 

Side Clearance (without YUNCA flue guard fitted) 

 

800mm 

 

Corner Clearance (without YUNCA flue guard fitted) 

 

200mm  

 

Minimum Hearth clearance (from door aperture) 

 

300mm  

 

F.  

YUNCA Flue Kit 

(

complies to AS/NZS 2918:2001, Appendix F)

FIG A, B, E 

1

. 4.2m x 150mm stainless steel flue. 

4

. 1 x insulation boundary shield. 

2

. 2.4m x 250mm galvanised liner. 

5. 

2 x spider brackets. 

3.

 1 x ceiling tile. 

6.

 1 x weather cap & cowl. 

Please Note:

 

All joints must be sealed with flue sealing compound. Use stainless steel 

screws or rivets to join the flue pipe (three equally spaced places at each joint). The first 

length of flue pipe must be screwed to flue spigot. The required minimum flue termination 

height is 4.6 m above the floor protector.  

 

G. 

 Flue Mounted Shield (Flue Guard) Kit: FIG A  

1. 

1 x 1200mm length back guard plus a 900mm adjustable extension.  

2. 

1 x 1200mm length perforated front guard     

 
 
 
 
 
 

A division of Terry Young Ltd, New Zealand

 

 

Reviews: