28
4.4.
Assembly inspection
The following points must be fulfilled:
•
The oil flow of the attachment and the carrier machine are the same.
•
The hydraulic hose for the return line is connected to the tank without return
pressure.
•
The hydraulic hose for the pressure line is connected properly.
•
The hydraulic quick couplings are fitted properly.
•
The bolted connections are fully tightened.
CAUTION
Improperly connected return lines can lead to major damage and cause
accidents.
•
Make sure that the return line is properly connected.
NOTICE
Performing commissioning at temperatures below -10°C (14°F) can cause
damage to seals and hydraulic components due to increased hydraulic
pressure.
•
Switch on the hydraulic pump of the carrier machine 5 to 10 minutes
before commencing work to allow the hydraulic oil to warm up.
4.5.
Functional checks
Carry out a functional check of the attachment after assembly and after all
related tasks have been completed.
•
Check that all mechanical and hydraulic connections are
firmly seated
and
free of leaks
. Tighten with permissible
tightening torque
as necessary
(see
Maintenance chapter
).
•
Check that all connected lines can move freely.
In order to avoid wear, the lines must not rub against each other, nor be too
short nor too long!
•
Ensure that no
hydraulic fluid
escapes from the connections.
•
Ensure that
all functions are working correctly
.
Procedure
Summary of Contents for AUGERTORQUE SB Series
Page 50: ...50 NOTES ...
Page 51: ...51 NOTES ...