ZVFCV 39 / 42 / 47
Basic Finishing 2: S1 or S1PF (ZVFCV39 / 42 Only) Surround
Step One:
Frame Fireplace with nailing tabs oriented as
shown.
Step Two:
Use Drywall to finish face of wall.
NOTE:
Drywall will be flush with fireplace face.
Step 3:
Once wall is completely finished, Surround may be
installed. Surround will conceal edges of fireplace.
Note:
If installing tile, brick, or other material around the
perimeter of the surround:
You MUST Leave 4” of the face exposed around the
fireplace opening on the Sides, 4” at the Bottom for the
S1PF, and S1 must be clear at Bottom. 4-
1/16” must be
exposed on the top. This is to install and remove the
Surround.
A Tile Lip Kit is Available. Part No. ZCV-TLK
Nailing Tab
Fireplace
Opening
Drywall
Fireplace Frame
Fireplace
Opening
Fireplace
Opening
ZCV-TLK Here
Drywall
Fireplace Frame
Drywall
Surround
4-1/16” MIN
4” MIN
18