ZCVRB60- Framing Dimensions –Unvented Chase-Ventilation Plates In Place- As Shipped
Determine whether face of fireplace will be:
Flush with finished wall (e.g., for surround, cultured stone or other non combustible covering).
Flush with framing (to be covered with concrete board for a Flat Wall appearance).
Refer to Nailing Tab Guide section also.
39-3/4”
HEADER
56” MIN
Plus Rise of
1/4” Per Foot
MIN 76”
Ceiling &
Enclosure
MIN 76”
Ceiling &
Enclosure
Fig.1
Framing for Horizontal Vent
Termination
(See
Installation of Side
Wall Venting
Section)
Vertical Venting MUST maintain 1” clearance to combustibles.
These Structures Are Not
Load Bearing.
Fig. 1
Shown flush
with framing.
TV
Optional
Recess
12”
12”
9”
Non-
Combustible
15-1/2”
16