Kilsen KZ705R Installation Sheet Download Page 1

© 2015 UTC Fire & Security. All rights reserved. 

1 / 12 

P/N 10-4221-501-3KZR-01 • ISS 25FEB15 

 

KZ705R Mounting Base Installation Sheet 

EN  BG  ES  FR 

IT  NL  PT  RO  SR  TR 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

EN: Installation Sheet 

Description 

This manual gives installation and wiring information for the 
KZ705R Mounting Base (with relay) for use in intrusion 
systems. 

Installation 

Note: 

For general guidelines on fire system planning, design, 

installation, commissioning, use and maintenance refer to the 
EN 54-14 (2001) standard and local regulations. 

Placement and spacing 

Install the base near the centre of the room or hall whenever 
possible. Always place the base a minimum of 100 mm from 
any wall. When the base is wall mounted, the top of the base 
should be 100-300 mm from the ceiling. 

When more than one detector is used, use the spacing of 9 m 
as a guide on smooth ceilings. Other spacing may be used 
depending on ceiling height, high air movement, and other 
conditions or response requirements. 

 

Wiring 

Caution: 

To ensure correct operation of your system, you 

must follow the recommended cabling practices described 
below. 

The cable used should be 1.5 mm² twisted pair cable or 
screened cable if risk of interference. Note that the internal 
cable feed is not centered. 

Direct cable connection 

For direct cable connection, break the plastic cable entry tab, 
as shown in Figure 2. The maximum cable width is 10 mm. 

The mounting base also allows for direct cable and tube 
connection using a S700 adaptor (not supplied). 

Connection 

Connect the mounting base as shown in Figure 1. 

Installing the detector head 

To install a detector head, insert the head and rotate it 
clockwise until it is properly aligned and “sets” into the base as 
shown in Figure 3. Rotate it further clockwise to lock it in place. 

 

Summary of Contents for KZ705R

Page 1: ...s used use the spacing of 9 m as a guide on smooth ceilings Other spacing may be used depending on ceiling height high air movement and other conditions or response requirements Wiring Caution To ensu...

Page 2: ...operating Temperature storage Relative humidity 10 to 70 C 10 to 70 C 95 noncondensing Regulatory information Manufacturer United Technologies Safety System Co Ltd 80 Changjiang East Road QETDZ Qinhu...

Page 3: ...r cable de 1 5mm par trenzado normal o apantallado si hay riesgo de interferencias La entrada de cable no est centrada Conexi n de cable directa En caso de entrada de cable directo romper la leng eta...

Page 4: ...res de r action C blage Attention pour garantir le bon fonctionnement de votre syst me vous devez suivre les proc dures de c blage recommand es d crites ci dessous Utilisez un c ble torsad de 1 5 mm...

Page 5: ...ta diretta del cavo staccare la linguetta di plastica come mostrato nella Figura 2 La larghezza massima consentita del cavo 10 mm La base di montaggio permette l installazione con cavo diretto e con t...

Page 6: ...Sluit de montagevoet aan zoals wordt weergegeven in afbeelding 1 De detectorkop installeren Als u een detectorkop wilt installeren plaatst u de kop en draait u deze rechtsom totdat deze correct is uit...

Page 7: ...imento de teste detalhado veja abaixo Testar a base Para gerar um alarme utilize um aerossol de teste para activar o detector de fumo ligado unidade e verifique se o painel de controlo de monitoriza o...

Page 8: ...dac este cazul Specifica ii Tensiunea de func ionare 9 14 V c c Consumul releului 12 mA mp m ntare necesar Nu Dimensiuni 29 100 mm Mediu de func ionare Temperatur de func ionare Temperatur de depozit...

Page 9: ...at 7 6003 DH Weert Holandija Sertifikacija 2012 19 EU WEEE direktiva Proizvodi koji nose ovu oznaku se ne mogu odlagati kao nesortirani komunalni otpad u Evropskoj Uniji Da bi se pravilno reciklirao p...

Page 10: ...e dedekt r adresinin uygun olan yerde do rulanmas gerekir Teknik zellikler al ma gerilimi 9 14 VDC R le t ketimi 12 mA Toprak ba lant s gereklidir Hyr Boyutlar 29 100 mm al t rma ortam S cakl k al ma...

Page 11: ...P N 10 4221 501 3KZR 01 ISS 25FEB15 11 12...

Page 12: ...12 12 P N 10 4221 501 3KZR 01 ISS 25FEB15...

Reviews: