To access the AC terminal block, you will need to remove the AC access panel. For more infor-
mation, see "Removing the AC Access Panel and PDP Internal Faceplates" on page 44 of Conext
XW-PRO-NA- Installation guide.
The AC terminal block includes three terminals each (L1, L2, and Neutral) for AC Grid input (AC1),
AC Generator input (AC2), and AC Out (AC LOAD) connections, see Figure below.
AC IN
AC OUT
GRID
AC IN
(AC1)
AC
GEN
LOAD
(AC2)
N
L1
L2
N
L1
L2
N
L1
L2
AC IN
AC OUT
AC IN
GRID
(AC1)
AC
LOAD
GEN
(AC2)
N
L1
L2
N
L1
L2
N
L1
L2
The neutral inputs are connected to each other, requiring only one neutral connection when in-
stalled with a Power Distribution Panel (PDP). Without the PDP, additional neutral connections may
be required at the input sources.
13.2 Grounding AC Equipment
LEGEND
1. To AC ground bar.
2. To main utility panel.
3. To Inverter load sub-panel.
4. Generator disconnect.
5. To AC generator.