P/N 19302390
Revised on 3/1/14, Kifco, Inc.
Table of Contents
Introduction
1
Safety
3-6
Handling the Polyethylene Tube
7
Timing
8-9
Set-up & Operation
10-17
Prepare for Trolley Pull-Out
10
Trolley Pull-Out
11
Trolley Set-Up
12
Prepare for Operation
12-13
Sanitation System
13
Plumbing Set-Up
13-14
Booster Pump Start-Up
14-15
Retraction Engine Start-Up
15
Injection Pumps
16
Application w/ Handheld Nozzle
16
Trolley Retraction
16
Retraction Speed
17
End of Run Procedures
18-19
Winterization & Storage
20-21
Required Maintenance
21-24
Wiring Diagram
25
Warranty
26-27