![KidKraft Cedar Summit F25745 Installation And Operating Instructions Manual Download Page 43](http://html1.mh-extra.com/html/kidkraft/cedar-summit-f25745/cedar-summit-f25745_installation-and-operating-instructions-manual_1965920043.webp)
43
A:
On the inside edge of (083) Back Wall Panel, measure 2” up from the floor and place EN71 Hand Rail so it is
flush to the edge as shown in fig. 16.4. The bottom of the Handrail should be centered on (021) Left Access. Pre-
drill holes using a 3/16” (4.8 mm) drill bit then attach EN71 Hand Rail using 2 (WL3) 1/4 x 1-3/8” Wafer Lags (with
flat washer). (fig. 16.3 and 16.4)
Hardware
Fig. 16.3
Fig. 16.4
2 x
1/4 x 1-3/8” Wafer Lag
(1/4” flat washer)
Other Parts
1 x EN71 Hand Rail
WL3
WL3
WL3
Step 16: Attach Steel Hand Grips and Handrail to Fort
Part 2
021
021
083
083
EN71 Hand Rail
1/4” Flat Washer
1/4” Flat Washer
2”
5cm