1 x
5/16 x 2-1/8” Wafer Bolt (5/16” flat washer, 5/16” t-nut)
1 x
1/4 x 2-1/2” Wafer Lag (5/16” flat washer)
1 x
#8 x 3” Wood Screw
2 x
#8 x 2” Wood Screw
Hardware
Wood Parts
1 x
Support Diagonal 5/4 x 4 x 24-1/2”
1 x
Diagonal 2 x 3 x 42-1/4”
092
093
Step 9: Attach Diagonals
Part 2
D:
Loosely attach (092) Support Diagonal to (093) Diagonal with 1 (WB9) 5/16 x 2-1/8” Wafer Bolt (with flat
washer and t-nut) then place (093) Diagonal tight and flush to the front of (050) SW Wall Panel. (092) Support
Diagonal to be flush to the bottom of (050) SW Wall Panel. (fig. 9.3 and 9.4)
E:
Pre-drill pilot hole with a 3/16” drill bit then attach (093) Diagonal to (050) SW Wall Panel with 1 (WL5) 1/4 x
2-1/2” Wafer Lag (with flat washer), checking that it remains flush to outside edge. (fig. 9.3 and 9.4)
F:
Making sure bottom of (092) Support Diagonal is flush to bottom of (050) SW Wall Panel then attach with 2
(S11) #8 x 2” Wood Screws and 1 (S4) #8 x 3” Wood Screw then tighten the bolt. (fig. 9.3 and 9.4)
5/16”
T-Nut
5/16” Flat
Washer
050
092
Fig. 9.3
Fig. 9.4
WL5
5/16” Flat
Washer
S11
S4
Flush
Flush
WB9
WL5
WB9
050
S4
S11
093
34
Summary of Contents for Cedar Summit Canyon Ridge
Page 113: ...NOTES 113 ...