Step 29: Attach Elbow Assemblies and TNR2 Slide
Support
Hardware
1 x
#12 x 1” Pan Screw
1 x
1/4 x 1” Pan Bolt
(1/4” flat washer & 1/4” lock nut - previously removed)
16 x
1/4 x 3/4” Pan Bolt
(1/4” lock nut)
PB6
Other Parts
1 x TNR3 Tube Support
4 x TNR2 Slide Clamp Ring
PB1
Note: When installing Pan Bolts make sure to look at holes so bolts go through the side with the round
recess and the lock nuts go through the side with the hexagonal recess. Keep all bolts loose until
further step.
A:
Attach the two remaining Elbow Assemblies as instructed in Steps 26 and 27.
B:
Place TNR Brace Assembly against (041) Narrow Back Panel so it sits under the slide. It is not attached yet.
(fig. 29.1)
C:
On the fourth attached Elbow Assembly remove the pan bolt and nut which is facing the fort (installed in Step
24). (fig. 29.1)
The bolt will no longer be needed, but keep the lock nut.
D:
Loosely attach TNR3 Tube Support (at the slightly bent end) to the Clamp Ring using 1 (PB6) 1/4 x 1” Pan
Bolt (with flat washer and the previously removed lock nut). (fig. 29.2)
E:
Rotate TNR3 Tube Support and attach to (040) Slide End Panel using 1 (S6) #12 x 1” Pan Screw as shown
in fig. 29.2.
F:
Fully tighten screw and bolt.
Remove PB1 (1/4 x 3/4”
Pan Bolt) first then install
PB6 (1/4 x 1” Pan Bolt
with flat washer)
Lock
Nut
Fig. 29.1
Fig. 29.2
Attach 2
remaining
Elbow
Assemblies
Flat
Washer
Note: Flat
end down
TNR 3 Tube
Support
S6
040
TNR Brace
Assembly
S6
041
PB6
74
Summary of Contents for Cedar Summit Canyon Ridge
Page 113: ...NOTES 113 ...