![KidKraft Cedar Summit Canyon Ridge Installation And Operating Instructions Manual Download Page 52](http://html1.mh-extra.com/html/kidkraft/cedar-summit-canyon-ridge/cedar-summit-canyon-ridge_installation-and-operating-instructions-manual_1965917052.webp)
Step 17: Final Swing Post Assembly
Fig. 17.1
5/16” Flat
Washer
140
Hardware
Pre-drill all holes using a 3/16” drill bit before installing the lag screws.
Note: Tighten all bolts from Step 15 series before installing lag screws.
A:
Attach 1 (LS9) 5/16 x 4-3/4” Lag Screw (with flat washer) into each (152) SW Post, as shown in fig. 17.1.
B:
Attach 1 (LS9) 5/16 x 4-3/4” Lag Screw (with flat washer) into remaining hole of the Heavy C-Bracket into
(140) Engineered SW Beam. (fig. 17.1)
3 x
5/16 x 4-3/4” Lag Screw
(5/16” flat washer)
5/16” Flat
Washer
LS9
Heavy C-Bracket
LS9
152
LS9
52
Summary of Contents for Cedar Summit Canyon Ridge
Page 113: ...NOTES 113 ...