Step 20: Upper Crowsnest Assembly
Part 2
D:
Attach 1 (203) Crowsnest Short flush to the top of (200) Crowsnest Top using 6 (S11) #8 x 2” Wood Screws
as shown in fig. 20.2.
E
: Attach 1 (204) Crowsnest Spacer flush to the outside of each (201) Upright Crowsnest using 3 (S11) #8 x 2”
Wood Screws per board as shown in fig. 20.2.
1 x
Crowsnest Short 5/4 x 4 x 25-1/2”
2 x
Crowsnest Spacer 1-1/4 x 2 x 27-1/2”
203
Wood Parts
204
12 x
#8 x 2” Wood Screw
S11
Hardware
Fig. 20.2
203
204
Flush
201
200
S11
S11
204
x 6
S11
Flush
57
Summary of Contents for Cedar Summit Canyon Ridge
Page 113: ...NOTES 113 ...