94
Step 44: Attach Clock Assembly
Other Parts
1 x Gable Clock Assembly
Hardware
4 x
#8 x 1” Pan Screw
S10
A:
On the front of the assembly measure 3-1/4” up from the bottom of the centre board in (042) Narrow
Front Panel then place the Gable Clock Assembly at the marked location centred under the Flower Box then
attach with 4 (S10) #8 x 1” Pan Screws. Make sure the top screw connects to the block at the back of (042)
Narrow Front Panel. (fig. 44.1, 44.2 and 44.3)
Fig. 44.1
Fig. 44.2
Fig. 44.3
Flower Box
Flower
Box
Gable Clock
Assembly
Gable Clock
Assembly
S10
042
042
042
Inside View
Outside View
Top screw must
connect to this
board.
3-1/4”
Centre
Board
(Brockwell / Twin
Mountain Lodge)
Summary of Contents for BROCKWELL
Page 101: ...101 NOTES...