background image

5

Assemble units as described herein only. To do otherwise 
may result in instability. All screws, nuts and bolts must be  
tightened securely and must be checked periodically after  
assembly. Failure to assemble properly, or to secure parts 
may result in assembly failure and personal injury.

Toggle

®

 Tables - Dual Motor Height-Adjustable Base, Model EL

Assembly Instructions

Wire Trough (Optional)

Note:

 The wire trough is an 

optional accessory that must be 

ordered separately.

Note: 

Control cables can be 

routed differently than shown. 

The control box can be mounted 

to the underside of tabletops 24” 

in depth at one location between 

the cross-tube assembly  

(Figure 5). Control boxes 

mounting under tabletops 30” 

or 36” in depth can mount in 

one of five mounting locations, 

one being the same as the 

control box mounted between 

the cross-tube assembly on 

24” tabletops (Figure 5). If the 

control box is mounted between 

the cross-tube assembly, 

reference Figure 5 for placement 

of the wire trough. A 30” or 36” 

depth tabletop is the only depth 

which will allow a control box 

to be in the following locations. 

If the control box is mounted to 

the front user side of the table, 

reference Figure 6. Mounting 

to the front of the table does 

not require the use of the 

“optional key pad” (Figure 6). 

If the control box is mounted 

behind the cross-tube assembly, 

reference Figure 7.

Model Number

Operating Load Capacity

TOGL2448EL

220 lb

TOGL2454EL

215 lb

TOGL2460EL

210 lb

TOGL2466EL

205 lb

TOGL2472EL

200 lb

TOGL3048EL

210 lb

TOGL3054EL

205 lb

TOGL3060EL

200 lb

TOGL3066EL

192.5 lb

TOGL3072EL

185 lb

TOGL3648EL

200 lb

TOGL3654EL

192.5 lb

TOGL3660EL

185 lb

TOGL3666EL

177.5 lb

TOGL3672EL

170 lb

TOGLC3048EL

180 lb

Table Operating Capacity Chart

Figure 7 - Wire Trough Over One Cross-Tube with
Control Box Behind Cross-Tube Assembly, 30” or 36” Table Depth

wire

trough

tabletop

cross-tube

assembly

control

box

power

cord

key

pad cord

(optional)

leg control

cord (long)

leg control

cord (short)

Summary of Contents for Toggle EL

Page 1: ...7 5 ft lb Figure 1 4 If casters are required twist both adjustable glides out of the foot Locking and non locking casters are supplied Locking casters should be located toward the front user side of t...

Page 2: ...o the underside of the tabletop centered between the cross tube assemblies Position the control box over the pre drilled mounting holes and secure using two M5 5 x 22 pan head screws Figure 2 9 For 30...

Page 3: ...lb Note Do not overtighten screws Once key pad is mounted route attached cord to control box Use Figure 4 for cord routing reference and for the optimal usage of zip tie points Once the key pad cord...

Page 4: ...g locations If the control box is mounted to the front user side of the table reference Figure 6 Mounting to the front of the table does not require the use of the optional key pad Figure 6 If the con...

Page 5: ...l box is mounted between the cross tube assembly reference Figure 5 for placement of the wire trough A 30 or 36 depth tabletop is the only depth which will allow a control box to be in the following l...

Page 6: ...he pre drilled mounting holes of the R8 power module with the drilled mounting holes underneath the tabletop Secure the R8 power module to the tabletop using four 8 x 3 4 wood screws Take care to not...

Page 7: ...e clamp location drill a pilot hole to a depth of 3 4 making sure to not drill too deep piercing the tabletop Figure 10 3 Nest the power cord inside the cable clamps Position the cable clamps over the...

Page 8: ...ow table to cool Table Base moves erratically or is tilted one leg moves one does not Control box is not properly synchronized with the legs Ensure that all cables connections are fully seated Then pe...

Reviews: