Installation Note N5242-90122 27
Description of the Upgrade
Installation Procedure for the Upgrade
Install the Second Source Boards into the Analyzer
Refer to
for this part of this step of the procedure. New parts are
listed in
1.
Install the A8 26.5 GHz source 2 board (5087-7837) and the A13 13.5 GHz
source 2 synthesizer board (N5240-60074) in the analyzer as shown.
Secure the A8 26.5 GHz source 2 board with two screws (item
①
;
0515-0380) and torque to 21 in-lbs.
2.
Connect cable W2 (N5222-20090) between the A8 26.5 GHz source 2
board and the A13 13.5 GHz source 2 synthesizer board as shown. Be sure
to position the cable in the wire looms as shown. Tighten the cable
connectors to 10 in-lbs using a 5/16-in torque wrench.
3.
Connect the loose end of gray flex cable W67 (N5242-60030) to the A10
frequency reference board (J7). (The other end of this cable was previously
connected to J5 of the source 2 synthesizer board.)