26 Installation Note N5242-90122
Description of the Upgrade
Installation Procedure for the Upgrade
-
Figure 10
Second Source Boards Installation, Part 1
Install Cable on Source 2 Synthesizer Board
Install gray flex cable W67 (N5242-60030) to connector J5 of the Source 2
Synthesizer board. The loose end of the cable will be connected on the A10
frequency reference board (J7) after the Source 2 Synthesizer board has been
installed in the analyzer.