Keysight E8363B/C and E8364B/C Installation Note 13
General Information
Installation Procedure for the Upgrade Kit
Analyzers WITH Options 014 AND 081
Refer to
for the following procedure.
Remove the following cables:
— W63E8364-20073PORT 1 CPLR THRU to A25 test port 1 coupler
— W61E8364-20081A22 switch splitter to PORT 1 SOURCE OUT
— W67E8364-20156A25 test port 1 coupler to PORT 1 CPLR ARM
— W64E8364-20074PORT 2 CPLR THRU to A26 test port 1 coupler
— W62E8364-20082A22 switch splitter to PORT 2 SOURCE OUT
— W68E8364-20157A26 test port 2 coupler to PORT 2 CPLR ARM
— W71E8364-20153REFERENCE 2 RCVR R2 IN to A29 channel R2 mixer
— W99E8364-20152A45 reference switch to A28 channel R1 mixer