3) Set the power 0/1 switch to on, '1' position. Observe the following:
l
P.L. indicator lamp (red) is on. (Refer to Figure 5)
l
Memory protection indicator on. (Refer to Figure 14)
l
Micro-processor scan indicator is flashing.
l
Trunk idle/busy status indicators are off.
Note: The system will automatically cut off the power supply from battery when the
voltage gets too low, so that the battery can be later recharged.
System Test Procedure
9.06. The system test procedure is used to verify the operation of installed equipment and
to provide a confidence check before programming the system. Before starting
systems tests, ensure that the system is fully equipped and configured for operation
as required by the customer, and that the Power-Up Procedure was accomplished
successfully.
Station Equipment
9.07. Verify each telephone station for dial tone, voice transmission, and feature operation
as follows:
1) Go off-hook. Dial tone should be received and the
stations DSS button should be on (red).
2) Dial the extension number of another station.
Keyphone calling keyphone when using voice announce.
l
Dial tone should be removed when the first digit is dialed.
l
The called station should receive a call announce alerting tone.
Station calling another station with normal intercom ringing.
l
Dial tone should be removed when the first digit is dialed.
l
The called station should ring with ringback tone received at the calling
station.
l
Transmission should be normal when the call is answered.
Summary of Contents for Atlas IIE KSX 32i
Page 1: ...KSX 32i INSTALLATION MANUAL...
Page 17: ...FIGURE 2 Main Control Board MCB...
Page 36: ...FIGURE 7 Card Installation...