14. Commissioning Protocol for installation company
54
Handover certificate
(copy for the company carrying out the installation)
❏
The initial operation and instruction was carried out in the presence of the person authorised to perform the accep-
tance and the system operator.
❏
The system operator/person authorised to perform the acceptance was informed about the obligation to service the
product according to the enclosed operating instructions.
❏
Initial operation and instruction were not carried out.
The client/ person responsible for initial operation was handed the following components and/or product components
Initial operation and instruction is being carried out by (company, address, contact, phone)
The exact coordination of the dates for initial operation/instruction is being carried out by the system operator and person re-
sponsible for initial operation.
Place, date
Signature of person
Signature of system operator
Signature of the company
authorised to perform acceptance
carrying out the installation work
010-845EN_FKA_Schaltgerät_2011_03_010-131 Stand 10-07_AKTUELL2008.qxd 25.10.11 10:32 Seite 26
Summary of Contents for Staufix FKA Comfort
Page 22: ...22 Notizen...
Page 23: ...23 Notizen...
Page 25: ......
Page 27: ......
Page 53: ...010 845EN_FKA_Schaltger t_2011_03_010 131 Stand 10 07_AKTUELL2008 qxd 25 10 11 10 32 Seite 25...
Page 55: ...010 845EN_FKA_Schaltger t_2011_03_010 131 Stand 10 07_AKTUELL2008 qxd 25 10 11 10 32 Seite 27...
Page 78: ...78 Note...
Page 79: ...Note 79...