K°Bloc – Fully welded plate heat exchangers - English Version 2.2 - 01.2016
4
5 SETTING UP AND CONNECTING THE K°BLOC .................................. 28
5.1 INSPECTING THE EQUIPMENT UPON DELIVERY .................. 28
TRANSPORT VARIANTS ......................................... 28
TRANSPORT PARTICULARITIES............................ 29
5.2 SPACE REQUIREMENT AT THE PLACE OF INSTALLATION .. 29
5.3 REMOVING AND DISPOSING OF TRANSPORT
PACKAGING................................................................................ 30
5.4 TRANSPORTING THE K°BLOC TO THE PLACE OF
INSTALLATION AND SETTING IT UP ........................................ 31
TRANSPORTING AND SETTING UP A K°BLOC
DELIVERED IN UPRIGHT POSITION ...................... 31
TRANSPORTING AND SETTING UP A K°BLOC
DELIVERED IN HORIZONTAL POSITION ............... 36
5.5 CONNECTING THE K°BLOC...................................................... 51
OPTIONAL SAFETY ACCESSORIES ...................... 51
INSTALLING PIPING ................................................ 52
6 COMMISSIONING AND DECOMMISSIONING, OPERATION ............... 55
6.1 COMMISSIONING ....................................................................... 55
PRE-CONDITIONS ................................................... 56
COMMISSIONING..................................................... 56
6.2 OPERATION................................................................................ 60
6.3 DECOMMISSIONING .................................................................. 61
SHORT-TERM PUTTING OUT OF OPERATION ..... 61
DECOMMISSIONING - MAINTENANCE .................. 63
LONG-TERM PUTTING OUT OF OPERATION ....... 64
7.1 OPENING THE K°BLOC ............................................................. 67
PREPARATIONS ...................................................... 67
DISMOUNTING THE PANEL .................................... 69
7.2 REPLACING THE GASKETS ...................................................... 76
7.3 REMOVING THE BAFFLE PLATE BRACKET ............................ 77
7.4 CLOSING THE K°BLOC.............................................................. 78
INSTALLING A SINGLE PANEL ............................... 79
TIGHTENING THE PANEL ....................................... 82
7.5 LEAKAGE TEST .......................................................................... 93
7.6 OUTSIDE CLEANING.................................................................. 94
7.7 CIP CLEANING ........................................................................... 95