5
Operation and Service megaSun 7900
2.
Service Plan
Service intervals
For a safe operation of the sun beds, regular service works are
essential and have to be documented. Cleaning works have to
be done when necessary and do not have to be documented.
Service hours
What has to be done?
see
Every day
Check the
fi
lling level of the condensate tank and empty it if
necessary.
100
Change or clean
fi
lter mats
5.7
500 - 600
Change burners
For inductive apparatuses:
• Change
tubes
•
Change starters
•
Reset counter of service hours
5.4
For CPI-apparatuses (with burners) in Power-mode:
• Change
tubes
•
Reset counters (8)
•
Reset counter of service hours
Check and grease ropes of the canopy drive
5.8
Check all inner tubes and – if necessary – change them
Climatic apparatus:
•
Clean heat exchanger
•
Check the functioning of the condensate pump
5.10
800
For CPI-apparatuses (with burners) in Eco-mode or for CPI-
apparatuses (without burners) in Power-mode:
• Change
tubes
•
Reset counters (8)
•
Reset counter of service hours
1000
For CPI-apparatuses (without burners) in Eco-mode or with
megaSun CPI-tubes in Power-mode:
• Change
tubes
•
Reset counters (8)
•
Reset counter of service hours
8
Replace aquaCool nozzles.
5.11
1200
For CPI-apparatuses with megaSun CPI-tubes in Eco-mode:
• Change
tubes
•
Reset counters (8)
•
Reset counter of service hours
3000
Replace all the ropes
5.8