background image

  

 

the atmosphere such as sulfur, fluorine, and chlorine. These  

elements are found in aerosol sprays, detergents, bleaches,  

cleaning solvents, air fresheners, paint, and varnish  

removers, refrigerants, and many other commercial and  

household products. In addition excessive dust and lint may  

affect the operation of the unit and require more frequent  

cleaning. 

3.3.4 Switch setting  

PCB has 2 bits of switches. 

Table3-4 

6: 

Model selection 

21 

2)) 

6:B 

The ambient air temperature must  be above -7ºC and below  

43ºCIf the ambient air temperature falls outside these upper  

and lower limits the electrical elements will be activated to  

meet the hot water demand. 

Without Electric Heater 

Without Disinfect 

With Electric Heater 

With Disinfect 

6:B   

Table3-5 

3.4.2 

Water System Piping 

6: 

Model selection (User never allow  to alter the factory settings) 

PT valve(Temperature and pressure relief valve) properly 

installed with a discharge pipe run to an adequate drain and  

sheltered from freezing. 

21 

 

190L  model 

 

 

All piping properly installed and free of leaks. 

Unit completely filled with water. 

Default factory setting is: 

Water temperature limit valve or mixer tap (recommended)  

installed per manufacturer’s instructions. 

SW1 

21 

SW2 

21 

3.4.3 

Condensate Drain Line Installation 

Must be located with access to an adequate drain or  

condensate pump. 

 

 

Fig.3-13 

Condensate drain lines installed and piped to an adequate  

drain or condensate pump. 

3.3.5   Electric leakage protector 

3.4.4 Electrical Connections 

Creepage Protector 

The water heater requires 220 VAC for proper operation. 

GND 

Wiring size and connections comply with all local applicable 

codes and the requirements of this manual. 

Power Cable  with 
Creepage Breaker 

Water heater and electrical supply are properly grounded. 

Proper overload fuse or circuit breaker protection installed. 

3.4.5 Post Installation Review 

Fig.3-14 

3.4 Installation checklist 

3.4.1 Location 

Understand how to use the User Interface Module to set the  

various modes and functions. 

The flooring beneath the water heater must be able to support 
 the weight of the unit when filled with water (more than 286kg). 

Understand the importance of routine  

inspection/maintenance of the condensate drain pan and  

lines. This is to help prevent any possible drain line  

blockage resulting in the condensate drain pan overflowing. 

Located indoors (such as a basement or garage) and in a  

vertical position. Sheltered from freezing temperatures. 

Provisions made to shelter the area from water damage.  

Metal drain pan installed and piped to an adequate drain. 

IMPORTANT: Water coming from the plastic shroud is an  

indicator that both condensation drain lines may be blocked.  

Immediate action is required. 

Sufficient room to service the water heater. 

To maintain optimal operation check, remove and clean the  

air filter. 

Sufficient air for the heat pump to function, 

the water heater must be located in a space >15m³, and must  

have unrestricted air flow.   

NOTE 

For optimal efficiency and serviceability, the following clearances  

should be maintained: 800mm on the air inlet side, 800mm on the  

air outlet side, 600mm in the back, and 600mm in the front. 

The unit cannot be placed into any type of closet or small  

enclosure. 

The site location must be free from any corrosive elements in  

Installation & Owner‘s Manual 

Summary of Contents for COMPAK KHP 15/190 ACS1

Page 1: ...S MANUAL ALL IN ONE Type Air source Heat Pump Water Heater COMPAK KHP 15 190 ACS1 Thank you very much for purchasing our product Before using your unit please read this manual carefully and keep it fo...

Page 2: ...MD14IU 029DW 202000172619...

Page 3: ...being The wiring must be performed by professional technicians in accordance with national wiring regulations and this circuit diagram An all pole disconnection device which has at least 3mm separatio...

Page 4: ...Water Outlet Cover Electric Heater Electric Heater Water Inlet Drain Pipe When ordering repair parts please always give the following information 1 Model serial and product number 2 Parts name NOTE Al...

Page 5: ...ta will show more details You may be killed or seriously injured DANGER immediately if you don t obey instructions WARNING The unit must be earthed effectively A creepage breaker must be installed adj...

Page 6: ...water condensation Drain pipe for water condensation Before cleaning be sure to stop the operation and turn the breaker off or pull out the power plug Otherwise an electric shock and injury may be cau...

Page 7: ...Hot spring area where corrosive gases exist e g sulphide gas Factories where the power voltage fluctuates seriously Inside a car or cabin The water heater must be located in a space 15m and must have...

Page 8: ...using the tank When water flow smoothly out from water outlet pipe tap water outlet the tank is full turn off all valves and check pipeline to make sure there is no any leakage CAUTION 4 If the inlet...

Page 9: ...could charge fresh air into room 2 Air inlet without duct air outlet connects to duct A 5m 4 Duct Description A Air outlet Table3 1 Air inlet Round duct Rectangle duct Duct Dimension mm 160 160X160 2...

Page 10: ...It is recommended to install the unit in the indoor space it is not allow to install the unit at the rainy space Fig 3 8 D Rain Filter Owner should install the filter by self and the mesh size is abou...

Page 11: ...Electric Heater Item Content Fan capacity Terminal base Transformer Connected wires inside of the tank Zero phase electricity mutual inductor AC mutual inductor Relay connecting wires Relay Without D...

Page 12: ...ion Solar Input 300L ON OFF SW2 Factory Setting for 190L 300L Model Selection High Pressure Switch Transformer Panel Display Panel Display T5L Lower T5U Upper T3 Evaporator T4 Ambient Th Comp Tp Comp...

Page 13: ...ration 1 GND Wiring size and connections comply with all local applicable codes and the requirements of this manual Power Cable with Creepage Breaker Water heater and electrical supply are properly gr...

Page 14: ...installation 8 Sufficient inlet water pressure between 0 15MPa and 0 65MPa Water out Fig 4 1 4 2 2 About Running CAUTION 1 System Structure Figure Unit has two kinds of heat sources heat pump compress...

Page 15: ...se manually activate E heater Restart After a Long Term Stop When the unit is restarted after a long term stop trail running included it is normal that outlet water is unclean Keep the tap on and the...

Page 16: ...pressor Last error code ON OFF 8 Previous 1st error or protection code 9 Fig 5 1 Previous 2nd t error or protection code 10 11 5 2 Display Explanation Software number SET SET CLOCK DAY 1 2 ON 3 4 ON 5...

Page 17: ...s celsius will be lightened will show celsius degree If setting temperature unit as Fahrenheit will be lightened will show Fahrenheit degree Press for 10sec it will change between and No Icon Descript...

Page 18: ...ally ON 1 The moment of Manually ON has priority 2 The moment of Timer OFF has priority Set the hour value of timer Confirm the hour value of timer Then the minute value of timer will flash slowly CAN...

Page 19: ...ess button disinfect clock setting Then icon flash and icon will be lightened for 3sec to enter will Press button for and the hour value of clock will flash slowly 1s or no button operation for 30s th...

Page 20: ...unt of hot water can be tapped A Because the upper water sensor is located on the upper 1 4 tank when tapping hot water out it means there is at least 1 4 tank of hot water available 1 Public water su...

Page 21: ...out clock menmory so it is needed to reset clock when power put on again EF Clock chip error If necessary contact a qualified person to service the unit Ed P2 E EPROM chip error Contact a qualified pe...

Page 22: ...Operate the hander of PT valve to ensure that waterways are clear Clean the air filter every month in case of any inefficiency on the heating performance In terms of the filter set in air inlet direct...

Page 23: ...adjustable Water side exchanger Inlet pipe Dia Outlet pipe Dia Drain pipe Dia PT valve Dia The test conditions Ambient temperature 15 12 C DB WB Water temperature from 15 C up to 45 C Installation Ow...

Page 24: ......

Reviews: