Operating Manual
Original Operating Manual
17
6.3.2 Clamp and flange
Daily
Check all lines, hoses and connections for leakage and damage.
After 50h / every 500h thereafter
Check screws:
(10) on the clamp body (7, 9) / flange (11).
Replace loose or damaged screws. Torque the screws as specified in Chapter 6.1
General.
Weekly
Grease:
Sliding pieces (2) by way of the greasing nipples (1).
The supporting rollers in the standard version are maintenance-free.
Every 200h
Check wear on:
Sliding pieces (2).