Katadyn
Page 23
11.8
Electrical connection
ATTENTION!
All electrical connections must be done according to the local guidelines and
by qualified personnel.
The Control Cabinet is equipped with 2A slow blow fuse inside of the Mains
connector. Ensure that the
feeding power cable is fused accordingly.
Please see at the attachment (17.5 Electrical connection / 17.6 Electrical connection Activator
Anode/Cathode) for the electrical connection possibilities.
11.9
Starting the Electrical Control System
Once the power has been correctly connected to the Control Cabinet, the Mains Switch turned on and the
Operating Panel is started up, then the Katadyn Logo will appear. By touching the Katadyn Logo the
“Overview” Screen will appear.
11.10
Current/Dosage adjusting of the EK
The required current for the given silver ion dosage is calculated using Faraday’s First Law of Electrolysis.
Faraday‘s First Law of Electrolysis
The amount of any substance deposited or liberated during electrolysis is proportional to the quantity of
electric charge passed and to the equivalent weight of the substance.
NOTE
Due to the change in water flow, water quality or dosage need, the
effective silver dosage in the water has to be checked after commissioning
and the pre-set current of the Control Cabinet may need to be adjusted.
Summary of Contents for EK-24
Page 1: ...ELECTRO KATADYN INSTRUCTION MANUAL EK 4 EK 24...
Page 16: ...Katadyn Page 15 Change to the screen Alarm History Change to the screen Trend...
Page 37: ...Page 36 Katadyn 17 4 Dimensions EK 24 300 400 140 G 1 G 1 235 400 400 160 240 50 65...
Page 41: ...Page 40 Katadyn 17 6 2 EK 24 Anode brown Cathode blue EK Control Cabinet X1 1 2 br bl...
Page 42: ...Katadyn Page 41 18 CE declaration of conformity...