Installation Manual Kardia Alta
/
6
Installation
Rough-in
1.
Install 32mm PEX / PEL for water supply. Cut so that the tube
protrudes approx.70cm over finished concrete.
2.
Install 75mm PE / PP for floor drain. Cut so that the tube
protrudes approx. 10cm over finished concrete.
3.
The main cable for electrical supply can be installed in the top
or bottom of the Kardia unit.
4.
PEX pipe-in-pipe can be installed in top and/or bottom of
Kardia unit. For PEX pipes installed in the bottom, cut so that
the tube protrudes minimum 200cm over finished concrete.
*Tolerance on floor plan: +/- 10mm.