-
15
General inspection of the correct over-
all condition of the interior cleaner (op-
erator).
Check that the connection thread of the
interior cleaner is tightly seated (opera-
tor).
Check whether all screws are fastened
tightly (operator).
Check nozzles for tight seating (opera-
tor).
Check that the protective bar (accesso-
ry) is tightly seated (operator).
Check that the fall protection eye (ac-
cessory) is tightly seated (operator).
Rinse out the filter (operator).
Check the friction bearing of the water
turbine, replace if necessary (Customer
Service).
Check the friction bearing of the spray
rotor, replace if necessary (Customer
Service).
Applies only under ATEX conditions:
Check the ball bearings and replace if
these are free of grease/dry or do not
run smoothly (Customer Service).
Check the ball bearings and replace if
these are free of grease/dry or do not
run smoothly (Customer Service).
Rinse out the interior cleaner with water.
Turn the interior cleaner over and allow
the water to drain out.
Perform a visual inspection and repeat
the procedure if necessary.
DANGER
Risk of accident while working on the unit!
During all tasks:
Remove voltage from and secure high
pressure pump at the main switch.
Shut off the cleaning liquid supply.
Who may remedy faults?
Operator
Work designated with the sign “Opera-
tor” may only be carried out by persons
who have been instructed in the safe
operation and maintenance on the high
pressure plant.
Customer Service
Work designated with the sign “Cus-
tomer Service” may only be done by the
fitters of Kärcher Customer Service.
Maintenance intervals
Daily
Monthly or after 200 operating hours
Every 300 operating hours
Every 500 operating hours
Every 500 operating hours, at least
every six months
Every 1000 operating hours, at least
annually
Maintenance Works
Rinse out the filter
Troubleshooting
Troubleshooting notes
Who may remedy faults?
33
EN
Summary of Contents for ICH 80/16 Ps
Page 2: ...2...
Page 9: ...7 A Hochdruckanschluss B Anschluss ICH 80 16 Ps Ma blatt Gestell A B 9 DE...
Page 25: ...7 A High pressure connection B Connection ICH 80 16 Ps Frame dimension sheet A B 25 EN...
Page 41: ...7 A Raccord haute pression B Raccordement ICH 80 16 Ps Feuille de mesure B ti A B 41 FR...
Page 57: ...7 A Attacco alta pressione B Collegamento ICH 80 16 Ps Disegno quotato telaio A B 57 IT...
Page 73: ...7 A Hogedrukaansluiting B Aansluiting ICH 80 16 Ps Maatblad frame A B 73 NL...
Page 89: ...7 A Conexi n de alta presi n B Conexi n ICH 80 16 Ps Hoja de medidas carcasa A B 89 ES...
Page 105: ...7 A H gtrycksanslutning B Anslutning ICH 80 16 Ps M ttblad stativ A B 105 SV...
Page 118: ...4 A 1 B C D 0 20 E F G H I J K L A B C D E F G H A I J K L 118 RU...
Page 120: ...6 A B ICH 80 16 Ps ICH 80 16 Ps ca ca ca ca 80 72 M22x1 5 1 A B HKS 100 ICH 80 16 Ps 120 RU...
Page 121: ...7 A B ICH 80 16 Ps A B 121 RU...
Page 122: ...8 A B C D E ICH 80 16 Ps D E A C B 122 RU...
Page 123: ...9 A B C A B C 123 RU...
Page 128: ...14 15 2 2 2 K rcher 128 RU...
Page 129: ...15 K rcher ATEX K rcher 200 300 500 500 1000 129 RU...
Page 137: ...7 A Magasnyom s csatlakoz s B ICH 80 16 Ps csatlakoz sa llv ny m retlapja A B 137 HU...
Page 153: ...7 A Przy cze wysokiego ci nienia B Przy cze ICH 80 16 Ps rysunek wymiarowy rama A B 153 PL...
Page 163: ......
Page 164: ...http www kaercher com dealersearch...