English
Operating Instructions BR/BD 530/530 XL
19
Instrument panel
1
Detergent metering
2
Master switch
3
Overload fuse
4
Suction turbine switch
Before switching on the unit
Unloading the unit
n
Attach push handle with the 4 supplied
screws and fit the caps.
n
Place the long, lateral planks from the
packaging on the pallet and form
a ramp.
n
Secure the planks with nails.
n
Support the ramp by placing the shorter
planks underneath.
n
Remove the wooden laths.
n
Raise the cleaning head and remove
the cardboard packaging.
n
The unit can now be moved down the
ramp.
Attaching the suction bar
n
Insert the suction bar into the suction-
bar suspension device, ensuring that the
profiled sheet is situated over the
suspension device.
n
Tighten the star knobs.
n
Attach the suction hose.