
INITIAL INSTALLATION MANUAL
AF INTEGRA / AF-H INTEGRA
PAGE: 12
JUN 01/2011
Figure 11: KANNAD AF-H INTEGRA, axis of installation
The "Direction of Flight " arrow shall point towards the front or the bottom
of the helicopter (and not pointing 45° downwards):
- If the AF-H INTEGRA is installed with the "Direction of Flight " arrow
pointing towards the front of the helicopter, the ELT shall be mounted
with the upper side pointing towards the top of the helicopter.
- If the AF-H INTEGRA is installed with the "Direction of Flight " arrow
pointing towards the bottom of the helicopter, the ELT shall be installed
with the lower side pointing towards the front of the helicopter
(2) Fix the mounting bracket
- Drill 4 holes Ø 6 mm in the aircraft structure according to "Drilling mask":
Refer to Compact Mounting bracket (S1840502- 01), Outline
dimensions and weight, page 35
[Inner holes (1, 2, 3, 4) should be
preferred] or
Refer to Compact Universal Mounting bracket (S1840502-
02), Outline dimensions and weight, page 36
according to mounting
bracket used.
- If the attachement system is not solid enough to withstand a 100G load
([ELT + bracket weight] x 100) on the bracket, a reinforcement plate (not
supplied) should be installed as shown
Figure 12: Bracket installation
in
order to be compliant with the RTCA DO-182 recommendation.
- Fix the bracket with the 4 screws, 8 washers and 4 nylstop nuts supplied.
JUN 01/2011
Summary of Contents for AF INTEGRA
Page 59: ......