T
echnical manual OT-600-060/1
Page 22
14. Test protocol, Full function check.
OT 600-001, Main unit No.
Main PCB No.
OT 600-002, Hand unit No.
Hand unit PCB No.
Test performed - date & signature:
No. Test to be performed
Result
Expected
result,
Comments
a
Ocular control of the unit, labelling, internal wiring and
installation.
OK
1
Electrical safety test performed
OK
1.a Max earth current, reading:
< 500µA
1.b Insulation, reading:
> 2 M
Ω
2
The system can be operated from the hand unit.
OK
3.a Limitation of pressure when temp is increased:
(max 35 mb at 42ºC)
OK
3.b Electric over-pressure valve operating
OK
3.c Accumulated
time:
XX
hours
3.d SW-version, main unit (CP):
> version 1.5
3.e SW-version, hand unit (PP):
> version 1.4
3.f Mechanical over-pressure valve operating
OK
4
The system stops if the hand unit is removed and an
alarm is received.
OK
5
Alarm is received if power is removed during operation
OK
6.a Err 008 is received
OK
6.b Err 006 is received
OK
6.c Err 003 is received
OK