13
OODMANUAL 0720
KAM CONTROLS, INC.
I N S TA L L AT I O N C O N T I N U E D
WIRING
CAUTION: When electronics enclosure is open, be extremely careful to avoid any contact with interior fiber optic
connections. Failure to do so could result in the OOD malfunctioning.
• The installed 3/4” NPT plug is not part of the instrument installation and should be replaced by the appropriate
Ex certified 3/4” NPT plug for the final installation.
• The KAM OOD EX shall be connected by means of suitable cable entries, resp. conduit systems which correspond
technically to the requirements at least of the standard conditions, indicated on the cover sheet of the referenced
ATEX certification, and for which a separate test certificate is available. Thereby the operating conditions specified in
the appropriate certificates of the components are to be considered absolutely.
• Cable entries (heavy-gauge screwed cable glands) and sealing plugs of simple construction shall not be used.
For connection of the OOD by means of an approved conduit entry, the associated sealing device must be arranged
directly at the enclosure.
• Non-used openings shall be sealed according to EN 60079-1, section 13.8.
• The connecting lead of the OOD shall be installed as permanent installation and as such that it is sufficiently
protected against damage.