
IASMANUAL 0821
KAM CONTROLS, INC.
1
TA B L E O F C O N T E N T S
SECTION
TITLE PAGE
1
Introduction
2
•Available Models and Mounting Options
2
•Theory
of
Operation 3
•Sampler
Sequence
3
2
Specifications 4
•Specifications
4
3
Installation
5
•Main
Line
5
•PRV
Cracking
Pressure
Setup
10
•Field
Air
Connections
11
•Removal
12
4
Maintenance
13
•Seal
Kit
and
Replacement
Schedule
13
5
Troubleshooting
15
CAUTION:
When installing the IAS™ sampler in a pipeline containing petroleum products, petro-chemicals,
waste waters with the presence of pressure & temperature, and high-pressure steam refer to
the Pipeline Operators’ “Health, Safety and Environmental Policy Procedures” to ensure safe
installation.
KAM CONTROLS, INC. reserves the right to make changes to this document without notice.