
IASMANUAL 0821
KAM CONTROLS, INC.
9
1
1
2
2
A
A
B
B
Fig 3-6 & Fig 3-7
I N S TA L L AT I O N C O N T I N U E D
For 2" MNPT Seal Housing
MID
–
Minimum Insertion Distance
D1
–
Distance from the top of the valve to the pipe
WT
–
Pipe Wall Thickness
Ls
–
Pipe ID x 0.25 (Sampling Area Length)
Lt
–
Thread Engagement (0.75")
IAS Factor –
3.25"
MID=D1 + WT + Ls + IAS Factor - Lt
Example: D1=14"
WT=0.322"
ID=7.98"
IAS Factor=3.25
Lt=0.75"
MID=14 + 0.322 + (7.98 x 0.25) + 3.25 - 0.75
MID=14 + 0.322 + 1.995 + 3.25 - 0.75=18.817"
FIG. 3-7
MID for 2" MNPT Seal Housing
6.
Measure the calculated MID from the top of the Locking Collar and place a mark with a permanent marker or
tape on the Shaft (Do not use anything sharp to mark the shaft as this will create grooves that will damage the
O-rings in the seal housing.) FIG. 3-7 and FIG. 3-8.
7.
You are now ready to attach either model to the valve on the pipeline.
Mark here
8.
Slowly open Full-opening Valve and check for leaks.
9.
Loosen Socket Cap Screws on the Locking Collar using a 3/8" Allen wrench.
MID
1
1
2
2
A
A
B
B
Fig 3-1 , Fig 3-8 Fig 3-9, Fig
3-11
1
1
2
2
A
A
B
B
Fig 3-6 & Fig 3-7
Mark here
MID
FIG. 3-8
MID for Flanged Seal Housing