IASMANUAL 0821
KAM CONTROLS, INC.
13
1.
Turn off the air supply going to the Solenoid Valve.
2.
Disconnect the ¼" air connections going to the IAS™ Sampler Actuator Housing. FIG. 3-15.
3.
Disconnect the ¼" connection going to the IAS™ Sampler PRV sample outlet. FIG. 3-15.
NOTE: If line pressure exceeds 100 psi, use a KAM
®
IT Insertion Tool when installing/removing the IAS™ Sampler.
Failure to do so could result in bodily injury or damage to the sampler.
4.
Use a 3/4" wrench to loosen the Hex Nuts holding the Locking Collar ¼ to ½ turn. FIG. 3-15.
5.
Slowly loosen the Locking Collar by turning the Socket Cap Screws counter-clockwise using a 3/8" Allen wrench.
If there is pressure on the line, it will push the IAS™ Sampler out when the Locking Collar is loose. If there is
not enough pressure on the line, manually pull the IAS™ Sampler until the end of the probe stops inside the Seal
Housing.
6.
Tighten the Locking Collar by turning the Socket Cap Screws clockwise to prevent the IAS™ Sampler from sliding
back in the pipeline or in the way of the Full-Opening Ball Valve.
7.
Close the Full-Opening Ball Valve.
8.
Remove the IAS™ Sampler from the Full-Opening Ball Valve.
I N S TA L L AT I O N C O N T I N U E D
REMOVING THE IAS™ SAMPLER
Socket Cap Screw
Full-Opening Ball Valve
Seal Housing
Locking Collar
Actuator Housing
FIG. 3-15
PRV
Sample
Outlet
Hex Nut