It is prohibited! To fire the boiler with: 

-  small fraction  (dust)  of  waste  wood,  because  is  a  risk  of  explosion  or  sparks  

emission from the chimney; 

- rubbish (household waste); 
- with opened ignition damper (8). 

Attention! In order to prevent the smoke entering in the room, the upper fuel loading 

cover (8), furnace's and fuel loading doors (1, 6) and service covers (12, 27) has 
to  be  tightly  closed,  except  in  cases  of  boiler  ignition,  refueling  or  boiler 
cleaning. 

Attention!  The  ignition  damper  (13)  (see  picture  1)  within  the  boiler  firing  must  be 

fully closed ! 

Attention!  The  flue  duct  (15),  and  other  boiler  surfaces  not  covered  by  the  thermo 

insulation shields (5) becomes very hot  during operation. Do not touch them. 

Attention! Don’t overheat (boil) water in the boiler. 

7.1.

 

System preparation for heating 

Prior  to  boiler  start  firing  make  sure  does  the  system  is  filled  with  thermal  water 

and  de  aerated. We  recommend  to  apply  the  de  salted,  soft,  or  at  least    rainwater.  If 
there will be used the prepared "soft" water, than the boiler housing will serve for the 
longer  time.  As  well  it  is  necessary  to  make  sure  does  the  valves,  which  are 
disconnecting the boiler from the system, are not closed.  

7.2.

 

Boiler start up firing  

Before  starting  the  boiler,  open  the  smoke  draught  damper  (

15

)  (see

  picture  1

), 

ignition damper (

13

), through the doors (

and 

3

) put crushed dry wood or chips onto 

fire grate (

29

) and set on fire. Secondary air hole valves (

22

) have to be closed. Valves 

are adjusted when temperature in the boiler reaches 60 °C. 

When  combustion  starts,  after  ignition  load  is  burnt,  add  more  fuel  into  loading 

chamber (

see below how to add more fuel

), close the ignition damper (

19

). 

The more fine chopped logs burns more effective and increases the boiler output. 
Place firewood loosely into the combustion chamber (furnace) (

30

) so it could sag 

down to the bottom of the chamber freely. 

If coal is to be used, take 5 - 10 kg firewood and top with 10 cm coal. Coal is to be 

poured  layer  by  layer  in  a  number  of  times,  depending  on  fuel  quality  and  desirable 
heat volume. 

Attention! When firing the boiler for the first time, also after the long period of non-

operation  (after  summer  season),  it  is  necessary  to  heat  up  the  refractory 
concrete  parts  for  the  moisture  contained  inside,  converting  into  the  steam,  did 
not disintegrate such parts. For this purpose there to be ignited not big amount of 
the  fuel.  Fuel  volume  must  be  such  that  it  will  burned  within  20  –  30  min.  
After 2 hours the boiler is ready for normal operation. 

Summary of Contents for K-2-70

Page 1: ...CENTRAL HEATING SOLID FUEL BOILER KALVIS 2 70 TECHNICAL CERTIFICATE INSTALLATION AND MAINTENANCE MANUAL Made in Lithuania Pagaminta Lietuvoje LST EN 303 5 2012 20548 87 20548 93...

Page 2: ...e 12 7 1 System preparation for heating 13 7 2 Boiler start up firing 13 7 3 Air draught regulator adjustment 14 7 4 Boiler firing 14 7 5 Boiler extinguishing 15 7 6 Boiler cleaning 15 7 7 Frequently...

Page 3: ...a variety of solid lump well dried fuel If desired the boiler is easy to adapt for stoking in mechanized way with pellets The boiler is manufactured using modern materials and technologies We believe...

Page 4: ...oiler power is too high and it has to be operated at lower than nominal power we recommend to install the boiler with accumulation tank 5 Use fuel no damper than 25 In the case of higher fuel dampness...

Page 5: ...than 40 Exhausted flue temperature at nominal output up to C 203 Exhausted flue quantity at nominal output kg s 0 058 Connection sockets dimensions flue channel mm 250 heating system in G2 B drainage...

Page 6: ...er front has air draught regulator 17 controlling the primary air supply valve 2 thermometer 16 pressure gauge 18 hearth service door 1 covering inner cast iron door 3 Fuel loading chamber is closed b...

Page 7: ...ntry In the extreme case wooden pallet can be used as fuel for the boiler Picture 2 Boiler packing for transportation 6 Boiler installation Boiler is to be installed in the premises meeting the releva...

Page 8: ...h extra elbow its cross section cannot be less than the cross section of fume escape from boiler hole with bending radius no less than 100 mm tube between the boiler flue and chimney shall be no longe...

Page 9: ...firemen make the openings in the chimney joint in a suitable place for periodical cleaning of soot once a month it is recommended to have boiler examined by qualified chimney expert once a year Notice...

Page 10: ...rming which ensures the long service life of the boiler not allows to form the condensate There are not shown the auxiliary technological equipment of the boiler house expansion vessel valves and othe...

Page 11: ...ary air supply dampers 27 see also chapter 7 3 6 5 Connection of the boiler cooling system According to the requirements of LST EN 303 5 standard par 4 1 5 11 3 for boiler operation it is necessary to...

Page 12: ...oling system Attention Emergency cooling coil cannot be used for hot water preparation 7 Boiler operate Boiler can be operated by adult persons well familiarized with boiler construction and this tech...

Page 13: ...ng the boiler from the system are not closed 7 2 Boiler start up firing Before starting the boiler open the smoke draught damper 15 see picture 1 ignition damper 13 through the doors 1 and 3 put crush...

Page 14: ...and add more fuel in the hearth Tightly close fuel loading door 6 and ignition damper 13 According to the selected temperature with the means of air draught adjuster 17 open the primary air supply va...

Page 15: ...ically aggressive acids under effect of which boiler service life can be reduced significantly In order to make sure that the boiler is tight stock it at high intensity for several hours then stop sto...

Page 16: ...oving fuel out of the boilers burning chamber put burning fuel to the utensil with water to get as little fume as possible accessing the premises open windows and doors Do not pour water into burning...

Page 17: ...is uninstalled due to other reasons Boiler is constructed from various materials so Bring electric appliances if present to electric appliances recycling organization Metal parts go to metal scrap Rem...

Page 18: ...moisture 35 40 Just cut tree contains 35 60 water Tree cut in the beginning of winter contains least quantity of water Hardwood contains less water Wood has to be cut and split to make firewood Firewo...

Page 19: ...or free Manufacturer takes no obligation for boiler operation and related consequences grants no warrant if the boiler is inadequately selected poorly installed see chapter 6 or operated see chapter 7...

Page 20: ...ress Telephone In the case of failure please call Company Address Telephone Manufacturer UAB Kalvis Pramon s 15 LT 78137 iauliai Lietuva Lithuania Telephone 370 671 88891 E mail prekyba kalvis lt Warr...

Page 21: ...nsions Diameter Height Length Chimney draught Number of elbows Last revision date Outgoing smoke temperature Brief description of boiler connection Fuel used for testing Type During boiler testing fun...

Page 22: ...ddress Experts Telephone Failure works carried out Repairs date Expert s signature Company Address Expert Telephone Failure works carried out Repairs date Expert s signature Company Address Expert Tel...

Page 23: ...manual requirements Regarding that I have claims for this product __________________________________________ I think that my upper listed deficiencies are defects of your product so please send your r...

Page 24: ...24 Stick product barcode here...

Reviews: