2. Slowly open the shut-off valve
7
to release pressure.
3. Disconnect the male hose fitting
6
and close the shut-off valve
7
.
10.15 Replenish cooling oil
The machine must be isolated from the compressed air network and completely vented be‐
fore undertaking any work on the pressure system.
Material The hose coupling, shut-off valve and maintenance hose required for venting lie beneath the oil
separator tank.
Precondition Cut-off the electrical power supply via the power supply isolating device,
ensure that the device is locked off,
verify the absence of any voltage.
Fig. 27 Replenish cooling oil
1
Hose coupling (air cooler venting)
2
Pressure gauge
3
Hose coupling (oil separator tank venting)
4
Oil filler port with plug
5
Cooling oil level indicator.
6
Plug-in nozzle
7
Shut-off valve
A
Shut-off valve open
B
Shut-off valve closed
8
Maintenance hose
1. Vent the machine as described in section 10.15.1.
2. Fill with cooling oil and test run as described in section 10.15.2.
10.15.1 Venting the machine (de-pressurising)
Venting takes place in three stages:
■ Isolate the compressor from the air system.
■ Vent the oil separator tank.
■ Manually vent the air cooler.
10 Maintenance
10.15 Replenish cooling oil
68
Operating Manual Rotary screw compressor
SK
901848 21 E
Summary of Contents for SK 22
Page 2: ...Original instructions KKW SSK 2 21 en SBA SCHRAUBEN SC2IO KKW SSC 2 08 20180629 105600...
Page 6: ...Contents iv Operating Manual Rotary screw compressor SK 901848 21 E...
Page 8: ...List of Illustrations vi Operating Manual Rotary screw compressor SK 901848 21 E...
Page 10: ...List of Tables viii Operating Manual Rotary screw compressor SK 901848 21 E...